Looking at Backyard Pools? Here’s How Long a Pool Installation Near Me Takes in Dobbs Ferry, NY

Looking at Backyard Pools? Here’s How Long a Pool Installation Near Me Takes in Dobbs Ferry, NY

Are you looking at backyard pools? Here’s how long a “pool installation near me” takes in Dobbs Ferry, NY. Building a pool can help make your dreams of a perfect summer a reality, but the timeline can be a little intimidating. Will the project be done in time for summer fun? The scope of the project means that work will be happening for a considerable amount of time, and a large part of your backyard will be off limits throughout the process.

Related: How Pool Companies Near Me Customize Swimming Pools in Briarcliff Manor, Westchester County, NY

Different Materials, Different Timelines

While this disruption is an inevitable part of building your dream pool, the materials chosen do make a difference.

Fiberglass pools are constructed and tested before the hole is even dug in your backyard. Concrete and vinyl pools take months to construct, set, and test; all in all, the process of installing concrete and vinyl pools takes significantly longer—while you could be using your new fiberglass pool within a few weeks.

With a wide variety of fiberglass models available, your pool installation experts should have your lifestyle and aesthetics in mind.

The Project Begins: Permits and Design

After you’ve gotten in touch with the pool company and decided upon a design model to use and add features to, you’ll be signing a contract. As with all construction and landscaping projects, permits will need to be obtained. This process takes anywhere from one week to two months depending on the county office, so it’s best to get started as soon as possible.

Planning work can be done during this time, including choosing features such as waterfalls, hot tubs, lighting fixtures, and other amenities that will enhance your pool experience.

Excavation

The process of excavation is by far the most difficult and potentially dangerous portion of your pool’s construction. Moving a large amount of soil within a relatively small space with heavy machinery requires an expert touch. This necessitates not only proper permitting, but careful scheduling of the right talent for the job in order to minimize danger and damage. After the hole has been dug, there needs to be some backfilling and setting of the soil to prevent sinking once the pool is filled. The excavation project and post-excavation work can take two to three solid days of work from the team, barring inclement weather.

Concrete Shell Construction

To help protect and insulate the fiberglass shell, the team may construct a concrete shell. Soil is constantly changing due to water content and above-ground factors that pack in the soil. There are always air pockets, and disturbed soil during an excavation will need to be secured in place. The concrete shell achieves that. Once the concrete is poured, it needs to dry and set over the course of a few days—typically around two or three days. Then, the fiberglass shell can be installed.

Post-Installation Work

Luckily for everyone involved, the fiberglass shell was already manufacturer-tested and approved before it even arrived in your backyard.

Post-construction inspection is a process that gunite and vinyl pool owners have to endure which may take weeks longer. After installation of fiberglass pools, careful cleaning of the shell and surrounding surfaces will protect the surface. The surrounding dirt will need to be graded in line with the new pool and possibly lawn or landscape features replaced. Then, your pool will be cleaned a final time and coverings installed if necessary. This process could take anywhere from two to four days.

Related: 7 Reasons to LOVE a Fiberglass Pool : Albert Group Landscaping and Swimming Pools Review

About the Author

Our company started with a simple idea: Treat people the way we’d like to be treated. Provide choices, be up-front with pricing, and give them quality features in their landscape. More than 15 years and hundreds of satisfied customers later, we continue to make good on this commitment. Pool technology has changed tremendously, opening up the possibilities for what type of pool you can have and the stonework surrounds—and all the elements that can go along with it. This has made installing great poolscapes even more enjoyable for our crew.

Previous
Previous

Pool Companies Near Me Suggest These 5 Tips When Planning an Inground Pool in the Harrison, NY, Area

Next
Next

When a Fiberglass Pool Is the Best Choice for an Inground Pool in Hastings-on-Hudson, NY